Jpt Overcoming barriers in 2025
The Jpt brand has managed to overcome the barrier of installing 300 valves to control water injection with extended reducers in Colombia. These valves have a service time of more than 18 months, which is being confirmed by the good stability of the installed valves, this allows optimizing the cost and maintaining stable production. This …