Jpt Overcoming barriers in 2025
The Jpt brand has managed to overcome the barrier of installing 300 valves to control water injection with extended reducers in Colombia. These valves have a service time of more than 18 months, which is being confirmed by the good stability of the installed valves, this allows optimizing the cost and maintaining stable production. This
Jpt Overcoming barriers in 2025 Read More »











