The Jpt brand has managed to overcome the barrier of installing 300 valves to control water injection with extended reducers in Colombia. These valves have a service time of more than 18 months, which is being confirmed by the good stability of the installed valves, this allows optimizing the cost and maintaining stable production. This system uses three expansion chambers which provide better stability than the conventional system.